Friday, December 10, 2010

End of Week Two

It's been a productive week for the demolition team. 

 This was the hallway, with entry to bathroom and 2nd bedroom down LHS
 Ceilings gone throughout
 Looking from old hallway through 2nd bedroom, bathroom and third bedroom
A new concept in open air Toilet, Laundry and pantry

 Checkout the old boiler!

1 comment: