Friday, December 10, 2010

End of Week Two

It's been a productive week for the demolition team. 

 This was the hallway, with entry to bathroom and 2nd bedroom down LHS
 Ceilings gone throughout
 Looking from old hallway through 2nd bedroom, bathroom and third bedroom
A new concept in open air Toilet, Laundry and pantry

 Checkout the old boiler!

Sunday, December 5, 2010

Demolition - Week 1

A full skip was taken away on the weekend so there has been quite a bit of progress this week.  Builders were only on site for one day but it's amazing how much they got through.  Check out the photos below.  They're back at it again today so will be interested to see what the next step is.  We're thinking they must be getting close to propping to allow some walls to come down.  I do love this bit of the project.

Standing in the entry near the front doors

The old lounge (will be the guest room)

Not much of the kitchen left


Green X denotes a wall to be removed

Looking down the existing hallway

Bathroom

Looking into one of the bedrooms.  This will become our WIR.

The master bedroom.  Big cupboards have been ripped out from this corner.

Looking into existing dining room, soon to be sitting room