It's been a productive week for the demolition team.
This was the hallway, with entry to bathroom and 2nd bedroom down LHS
Ceilings gone throughout
Looking from old hallway through 2nd bedroom, bathroom and third bedroom
A new concept in open air Toilet, Laundry and pantry
Checkout the old boiler!
Lol love the new toilet:). Great progress.
ReplyDelete